Wednesday, 19 July 2017

TomVKlaveren published Proposed new Southern timetable would cut direct trains from...

Plans which would see no direct trains between London Bridge and Mole Valley after 6pm have been slammed. Current timetable proposals for 2018 by Govia Thameslink, the parent company of Southern Rail would see the current 6.03pm service from London Bridge to Dorking replaced by a 5.55pm service which would call at Leatherhead, Ashtead and Bookham but not Dorking. Two direct services, the 6.32pm and 7.29pm from London Bridge, will be scrapped under the proposals. However, also included in the...

Proposed new Southern timetable would cut direct trains from...



from Surrey Mirror All Content Feed http://www.surreymirror.co.uk/proposed-southern-timetable-would-cut-direct-trains-from-london-bridge-to-mole-valley/story-30446805-detail/story.html

No comments:

Post a Comment